Course Content
Diesel Traction & Trainsets
Disaster Management, Safety
EnHM, Planning & PCO
G K
Numerical Aptitude
Carriage & Wagon Theory for LDCE(Mech)

store incoming inspection

1 / 80

1. Replacement of pre-inspected rejected items must be:

2 / 80

2. If material is rectified after Joint Inspection:

3 / 80

3. If rejection is not agreed upon in Joint Inspection, the material may be:

4 / 80

4. If the Inspecting Authority and Firm do not participate in Joint Inspection:

5 / 80

5. Who participates in a Joint Inspection?

6 / 80

6. For imported items, joint inspection must be called within:

7 / 80

7. Joint inspection for pre-inspected items rejected on technical grounds must be called within:

8 / 80

8. CMM and PCMM have powers to waive Ground Rent up to:

9 / 80

9. HQrs Dy.CMM is empowered to waive Ground Rent up to:

10 / 80

10. Depot Officers have powers to waive Ground Rent up to:

11 / 80

11. Ground Rent for items weighing above 50 kg is:

12 / 80

12. Ground Rent for items weighing below 50 kg is:

13 / 80

13. If the firm does not lift material within 21 days, Railways imposes:

14 / 80

14. The firm must lift rejected material within how many days (general)?

15 / 80

15. Items of infectious nature must be lifted by the firm within:

16 / 80

16. Rejected goods always remain at the risk of:

17 / 80

17. If replacement is not effected, Railways can terminate the contract under:

18 / 80

18. Warranty rejection replacement period is:

19 / 80

19. For GeM PO, the replacement of rejected goods must be done within:

20 / 80

20. The contractor must replace rejected goods within how many days (IREPS PO)?

21 / 80

21. Which charges must be endorsed while preparing the Rejection Advice?

22 / 80

22. The Rejection Register form number is:

23 / 80

23. The Rejection Advice form number is:

24 / 80

24. As per IRS clause 7.3(e), material with expiry of what percentage of shelf life is rejected?

25 / 80

25. Material received after cancellation of PO should be:

26 / 80

26. Material received without IC (Inspection Certificate) and IC marks is:

27 / 80

27. Material received excess to PO quantity is rejectable when excess exceeds what tolerance?

28 / 80

28. As per IRS clause 4.1, risk in goods transfers to Railways only when:

29 / 80

29. Material can be rejected if received after expiry of delivery date and item is:

30 / 80

30. If a specific warranty period is mentioned in the PO different from the general period:

31 / 80

31. For GeM POs, the general warranty/guarantee claim period is:

32 / 80

32. For IREPS POs, the general warranty/guarantee claim period is:

33 / 80

33. As per Railway Board guidelines, DRR must be cleared within:

34 / 80

34. CRAC stands for:

35 / 80

35. If no acceptance/rejection is done within 10 days in GeM PO, what happens?

36 / 80

36. PRC stands for:

37 / 80

37. For GeM POs, the acceptance/rejection period from PRC is:

38 / 80

38. As per IRS conditions for IREPS POs, consignee must accept/reject material within:

39 / 80

39. If material is rejected, which charges are imposed on the contractor?

40 / 80

40. If accepted, which document is prepared by the Receipt section?

41 / 80

41. CRN in UDM stands for:

42 / 80

42. CRC in UDM stands for:

43 / 80

43. In case of doubt in consignee inspection, the material may be referred to:

44 / 80

44. If PO conditions and Inspection Certificate requirements are not fulfilled, the depot must:

45 / 80

45. When receiving TPI-inspected material, the Receipt Section in-charge must:

46 / 80

46. M/s Intertek India Private Limited is one of the:

47 / 80

47. Which of the following is NOT one of the four contracted TPI agencies?

48 / 80

48. From 2023 onwards, inspection has been outsourced to:

49 / 80

49. Before 2023, pre-inspection agencies were:

50 / 80

50. In two-stage pre-inspection, what are the two stages?

51 / 80

51. For PO value above Rs.5 Lakhs, inspection is generally:

52 / 80

52. For PO value below Rs.5 Lakhs, the inspection is generally:

53 / 80

53. Insulation resistance and dielectric strength are tested under:

54 / 80

54. Hydraulic / pneumatic pressure tests are performed for:

55 / 80

55. Chemical analysis during incoming inspection includes:

56 / 80

56. Hardness testing methods used during mechanical testing include:

57 / 80

57. RT in NDT stands for:

58 / 80

58. DPT in NDT stands for:

59 / 80

59. MPI in NDT stands for:

60 / 80

60. UT in NDT stands for:

61 / 80

61. NDT stands for:

62 / 80

62. TPI stands for:

63 / 80

63. Which document shows the chemical composition and mechanical properties of material?

64 / 80

64. Dimensional verification is done using:

65 / 80

65. Which markings are verified during Visual / Dimensional Inspection?

66 / 80

66. During Visual Inspection, which of the following is checked?

67 / 80

67. Which of the following is a Pre-Inspection activity?

68 / 80

68. Document Verification inspection is performed for:

69 / 80

69. Combined SI + RI is performed for which type of items?

70 / 80

70. Receipt Inspection (RI) is conducted:

71 / 80

71. Inspection conducted at the manufacturer's premises before dispatch is called:

72 / 80

72. IEC/IS standards are applicable for which category of items?

73 / 80

73. BIS stands for:

74 / 80

74. IRS stands for:

75 / 80

75. Which organisation's guidelines govern incoming inspection in Indian Railways?

76 / 80

76. Incoming Inspection protects the railway organization from:

77 / 80

77. Which of the following is NOT an objective of Incoming Inspection?

78 / 80

78. The primary purpose of Incoming Inspection is to ensure:

79 / 80

79. Incoming Inspection is a quality control process conducted when:

80 / 80

80. Incoming Inspection is also known as:

Your score is

The average score is 0%

error: Content is protected !!
Scroll to Top