difficult lhb schedules

This detailed sequence includes specific cutting dimensions and steps.

1 / 40

1. What is the exact procedure for corrosion repair in side sill including cutting dimensions and sequence?

This comprehensive list covers all critical areas prone to corrosion.

2 / 40

2. What is the complete list of underframe vulnerable members and locations for corrosion inspection?

Both crack depth and height are checked for replacement.

3 / 40

3. What are the exact wear limits for ball joint control arm and rubber pad?

Different components have different replacement criteria.

4 / 40

4. What are the exact wear limits for traction center rubber bush and longitudinal pad?

Both crack dimensions and height are checked.

5 / 40

5. What are the exact wear limits for lateral bump stop?

This has different limits than the rubber disc.

6 / 40

6. What are the exact crack limits for secondary suspension rubber spring?

Vertical and horizontal cracks have different length and depth limits.

7 / 40

7. What are the exact crack limits for secondary suspension rubber disc?

Two parameters: depth of crack (t) and height (h) determine replacement.

8 / 40

8. What are the exact wear limits for primary suspension internal pad?

This uses a formula comparing the sum of acceptable portions to total length.

9 / 40

9. What is the exact rule for checking journal surface waves using marking blue?

This includes journal diameter, inner diameter, mounting force, and end play with acceptable minimum.

10 / 40

10. What is the complete procedure for SKF CTRB mounting including pressure and end play?

This includes journal diameter, inner diameter, seating load, and mounted end play.

11 / 40

11. What is the complete procedure for TIMKEN CTRB mounting including seating load and end play?

This height must be checked and adjusted during D3 schedule.

12 / 40

12. What is the exact air spring installation height requirement and the RCF letter reference?

This includes wiring checks with fault codes, timers, pressure switches, sensor gaps, and valve tests.

13 / 40

13. What is the complete WSP preventive check schedule for Knorr Bremse including fault codes?

Testing must rotate among coaches and among air springs within a coach.

14 / 40

14. What is the exact procedure for FIBA device functionality test with coach rotation requirement?

Different spring failures have different allowable speeds for continued travel.

15 / 40

15. What are the exact speed restrictions for different spring failures en-route?

Different coach types and spring positions have specific colour codes.

16 / 40

16. What is the complete colour coding scheme for primary and secondary springs for different coach types?

This is a specific inner secondary spring with lateral stiffness specification.

17 / 40

17. What are the exact parameters for secondary spring drawing no. 1269513 including bar dia, mean coil dia, test load, height, and lateral stiffness?

This is a specific outer primary spring with precise technical parameters.

18 / 40

18. What are the exact parameters for primary spring drawing no. 1267411 including bar dia, mean coil dia, test load, height, and stiffness?

This comprehensive list covers all critical components to check during rolling examination.

19 / 40

19. What is the complete list of rolling in/rolling out items for LHB coaches?

Different coach types have specific numerical ranges in the numbering system.

20 / 40

20. What is the exact coach numbering range in the previous system for all coach types?

This is a comprehensive list of tools with specific sizes and types.

21 / 40

21. What are the exact 19 items in the tool kit box with specifications?

The kit includes many specialized items with specific quantities.

22 / 40

22. What is the complete tool kit list for en-route troubleshooting with specific quantities?

Fan types vary by coach class and location, with lavatory fans only in AC coaches.

23 / 40

23. What are the exact fan specifications for AC and Non-AC coaches including size, type, and location?

AC and Non-AC coaches have different lighting requirements for different areas.

24 / 40

24. What are the exact lux level requirements for different coach types and areas as per passenger amenity schedule?

This includes steps from approach to final reconfirmation.

25 / 40

25. What is the exact sequence for coupling CBC fitted coaches including all safety checks?

This uses a special coupling to connect BP and FP hoses of the affected coach.

26 / 40

26. What is the complete procedure for bypassing BP pressure using BP-FP BY-PASS coupling?

This involves disconnecting the affected pipe and fitting a dummy plug.

27 / 40

27. What are the exact steps for BP-FP cut off angle failure on last coach?

This involves isolating the affected coach and conducting a continuity test.

28 / 40

28. What is the complete procedure for BP failure en-route including specific valve positions and sequence?

Two conditions trigger replacement: weight loss percentage and age.

29 / 40

29. What is the exact loss of weight percentage and age limit for gas cartridge replacement?

Different actions are required at monthly, annual, and 3-year intervals.

30 / 40

30. What are the exact acceptance criteria for fire extinguisher maintenance including monthly, annual, and 3-year hydraulic test specifications?

This TSO reference covers train parting procedures.

31 / 40

31. What is the complete TSO reference for driver waiting time after brake application?

Some components have specific torque values, others have condition checks.

32 / 40

32. What are the exact torque values for various bogie components as per Annexure 10.1?

The depth, pattern, and location are all specified.

33 / 40

33. What are the exact criteria for pitting holes on bogie frame as per RDSO No SV Bogie General dt. 14.07.2022?

Two specifications contribute to the total DFT with specific micron values.

34 / 40

34. What is the complete DFT requirement for primer and paint as per M&C/PCN/123/2006 and MDTS-094 with exact breakdown?

This is a specific corrosion protection treatment for rubber joints.

35 / 40

35. What is the exact composition of the protection treatment to be renewed on control arm rubber joint during Schedule D3?

There are three ranges: reject, re-machine (once), and accept without machining.

36 / 40

36. What is the complete specification for control arm rejection, re-machining, and acceptance criteria?

One reference is for wheel testing, the other for bearing limits.

37 / 40

37. What are the exact RDSO letter references for Eddy Current Array Testing and residual magnetism limits?

This is a comprehensive sequence from visual checks to function testing.

38 / 40

38. What is the exact sequence of actions for air brake equipment maintenance during Schedule D2?

New pads have a specific width, and replacement is at a minimum allowable depth.

39 / 40

39. What is the complete procedure for checking brake pads during Schedule D1 including width and wear limits?

Depot schedules have daily/weekly/monthly tolerances, shop schedules have kilometer-based limits.

40 / 40

40. What are the exact tolerance limits for each coaching depot and shop schedule in terms of days and kilometers?