Course Content
Diesel Traction & Trainsets
Disaster Management, Safety
EnHM, Planning & PCO
G K
Numerical Aptitude
Carriage & Wagon Theory for LDCE(Mech)

easy lhb schedules

Below this pressure, OEM guidance is needed.

1 / 40

1. What is the minimum pressure in nitrogen cylinder for fire suppression system during D2 check?

This pressure is maintained for 2.5 minutes.

2 / 40

2. What is the test pressure for hydraulic testing of fire extinguishers?

This is the size in meters of the red board.

3 / 40

3. What is the size of banner flag/board used for RED PROTECTION?

This is the threshold for en-route detachment.

4 / 40

4. At what temperature should an axle box be detached from service?

This slow speed allows for thorough inspection.

5 / 40

5. What is the speed for rolling in examination of passenger trains?

The defective bogie must be isolated first.

6 / 40

6. What is the speed restriction for a coach with deflated air spring en-route?

This is higher than for primary spring breakage.

7 / 40

7. What is the maximum permissible speed when one outer coil of secondary spring is broken en-route?

This is a reduced speed for continued travel.

8 / 40

8. What is the maximum permissible speed when one coil of primary spring is broken en-route?

This is different from AC coach springs.

9 / 40

9. What is the colour coding for inner primary spring of Power Car?

This is painted on the middle coil for identification.

10 / 40

10. What is the colour coding for inner primary spring of AC coaches?

This involves complete disassembly and overhaul.

11 / 40

11. What should be done to CBC during Shop Schedule III?

All dampers of all types are replaced.

12 / 40

12. What should be replaced during Shop Schedule III for dampers?

This applies specifically to Executive Chair cars.

13 / 40

13. What is replaced 100% during Shop Schedule II for furnishings?

These are completely replaced, not just inspected.

14 / 40

14. What should be done to brake gear pins and other bogie pins during Shop Schedule II?

These are replaced based on a specific list.

15 / 40

15. What should be replaced during Shop Schedule II for rubber and rubber/metal bonded parts?

This limit applies only if certain conditions are met.

16 / 40

16. What is the maximum depth of pitting holes permitted on bogie frame?

This is a specific solution for corrosion prevention.

17 / 40

17. What solution should be coated on control arm mating surface?

This can only be done once.

18 / 40

18. What is the permissible re-machining range for control arm?

This is when wear exceeds 0.5 mm from original.

19 / 40

19. What is the rejection diameter for control arm bearing surface?

This applies to trains operating at higher speeds.

20 / 40

20. When should wheel balancing be performed?

This is measured in Gauss or mT.

21 / 40

21. What is the maximum permissible residual magnetism in bearings after reconditioning?

These are specific types of cracks from heat and stress.

22 / 40

22. What should be checked for brake discs during Shop Schedule I?

This is a protective treatment for visible areas.

23 / 40

23. What should be renewed on control arm rubber joint during Schedule D3?

This is an advanced alternative to DPT.

24 / 40

24. What testing technique is recommended for LHB wheels during Schedule D3?

These are consumable components that wear out.

25 / 40

25. What should be replaced on earthing devices during Schedule D3?

This is a wear check of specific components.

26 / 40

26. What should be checked for earthing equipment during Schedule D2?

Replacement is based on condition, not time.

27 / 40

27. When should brake pads be replaced as per Schedule D2?

These components filter the air in brake pipes.

28 / 40

28. What should be cleaned during Schedule D2 for BP and FP lines?

This is a specific spray lubricant.

29 / 40

29. What is used to lubricate brake levers, pins and bushes during Schedule D2?

This is a small gap measured in millimeters.

30 / 40

30. What is the clearance to be verified between brake pad and disc surface during Schedule D2?

This is a manual check for abnormal temperature.

31 / 40

31. What is checked during Schedule D1 for axle bearings?

This removes accumulated moisture and contaminants.

32 / 40

32. What should be drained during Schedule D1?

Two methods are used: audible and visual.

33 / 40

33. How should air leakage be checked during Schedule D1?

This ensures free movement without contaminating brake discs.

34 / 40

34. What should be done to brake levers, pins & bushes during Schedule D1?

This is conducted at 72 months or a specific kilometer limit.

35 / 40

35. What is the time interval for Shop Schedule III?

This is conducted at 36 months or a specific kilometer limit.

36 / 40

36. What is the time interval for Shop Schedule II?

This is either time-based or kilometer-based, whichever is earlier.

37 / 40

37. What is the time interval for Shop Schedule I?

This schedule has a tolerance of ±15 days.

38 / 40

38. What is the frequency of Schedule D3 maintenance?

This schedule has a tolerance of ±3 days.

39 / 40

39. What is the frequency of Schedule D2 maintenance?

This is the most frequent maintenance schedule.

40 / 40

40. What is the frequency of Schedule D1 maintenance?

Your score is

The average score is 0%

error: Content is protected !!
Scroll to Top