Course Content
Diesel Traction & Trainsets
Disaster Management, Safety
EnHM, Planning & PCO
G K
Numerical Aptitude
Carriage & Wagon Theory for LDCE(Mech)

difficult icf ac coach

1 / 50

1. During the final joint inspection of the coach with divisional staff after POH, what specific additional document, besides the performance record, must be handed over?

2 / 50

2. In the context of moisture removal from the refrigeration system during RMPU compressor replacement, what is the significance of using a "two stage rotary vacuum pump" to create a "vacuum of 50 micron"?

3 / 50

3. What is the purpose of the specific instruction to "pinch off charging tube nearest to the compressor body" after charging refrigerant in an RMPU compressor replacement?

4 / 50

4. In RMPU POH, what is the specific jig reference number mentioned for ensuring the squareness of the roof opening before lowering the package unit?

5 / 50

5. What is the significance of measuring "the variation in temperature on different berths" during the cooling test, and what is the permissible limit?

6 / 50

6. In the context of cooling capacity tests, what does "providing electrical compensating loads for worst ambient conditions and full occupancy of the coach" simulate?

7 / 50

7. For synthetic type filters, what is the specific instruction during POH?

8 / 50

8. During the cleaning of wire mesh type air filters in POH, what is the purpose of immersing them in a solution of "hot water and soda (sodium carbonate)"?

9 / 50

9. What is the purpose of coating copper sockets and bus bar jointing surfaces with "corrosion resistant conducting grease" before making a bolted connection?

10 / 50

10. Why is it specified that the "under frame wiring if running loose shall be provided in rigid steel conduit"?

11 / 50

11. In fan motor overhaul, what specific IS standard is referenced for the IR value, spring requirements, and air delivery?

12 / 50

12. During the overhaul of the Pre-Cooling Transformer & Rectifier Unit, what specific checks are performed on the diodes?

13 / 50

13. After reconnecting all AC equipment during POH, why must a "pressure test and vacuum test shall be performed before charging the refrigerant"?

14 / 50

14. What is the critical reason for immediately closing pipe outlets whenever AC equipment is removed from the refrigeration system during POH?

15 / 50

15. When checking gauges and cut-outs during POH, why is calibration against a "standard gauge" necessary?

16 / 50

16. In control panel overhaul, what is the purpose of pulling out "the pin holding the pull off spring" and removing the "armature hinge pin" for examination?

17 / 50

17. In evaporator motor neutral axis setting, why is the motor run at "approximately 25% of the rated voltage" in both directions?

18 / 50

18. What is the theoretical basis for setting the neutral axis of a motor by finding the point of "minimum or zero kick" on a millivoltmeter connected across brushes of opposite polarity?

19 / 50

19. During motor overhaul, what is the purpose of "undercutting the mica" between commutator segments after skimming?

20 / 50

20. After cleaning the cooling coil and pressurizing it to 300 psi (21 kg/cm²) for leak testing, why is it immersed in a water tank "duly connecting a pressure gauge"?

21 / 50

21. In the context of cleaning cooling coils, what is the dual purpose of "scrubbing with brush" in conjunction with "compressed water jet"?

22 / 50

22. Why is it specified to "immerse the heat exchanger in water tank for 24 hours" before high-pressure washing during POH?

23 / 50

23. In the vacuum test for a compressor, why is the drop in vacuum level recorded after switching off the compressor, rather than just the ability to achieve vacuum?

24 / 50

24. What is the theoretical principle behind the leak back test being conducted "immediately after attaining pressure of 7 Kg/cm²" in the reservoir?

25 / 50

25. During the volumetric efficiency test of an overhauled compressor, why is a reservoir of exactly "100 litres capacity" specified?

26 / 50

26. In ACCEL compressor overhaul, what specific component must be checked regarding the "end play of crank shaft," and what action is taken if necessary?

27 / 50

27. In the context of POH for under-slung compressors, what is the purpose of "matching the colour" in Carrier 5F30 compressors between the tapered shaft and flexible coupling?

28 / 50

28. What does a "colour change in PCBs" to blackened indicate, and what action is required?

29 / 50

29. When cleaning PCBs inside the inverter during quarterly schedule, what specific precaution is mentioned regarding the cleaning tool?

30 / 50

30. What is the rationale behind the specific time delay of 2.5 minutes for the second compressor to start?

31 / 50

31. In the LP cut-out test for RMPU, why are the terminals of the vane relay shorted after taking out blower motor fuses?

32 / 50

32. During RMPU trip schedule, what is the purpose of checking the system with RSW-3 in VENT, AUTO, MANUAL HEATING, and MANUAL COOLING modes?

33 / 50

33. In the quarterly insulation resistance measurement for alternators and motors, what is the threshold value (in Mega ohms) that necessitates baking at 80°C for 1 hour?

34 / 50

34. During quarterly schedule, what is the specific method recommended for cleaning the commutator of coach fans?

35 / 50

35. What is the purpose of "flushing the drip tray" and checking the "drain pipe for clogging" during evaporator motor monthly maintenance?

36 / 50

36. In the monthly condenser maintenance, what is the significance of ensuring "minimum air flow of 4 meters per second through condenser"?

37 / 50

37. During monthly schedule, why is it specified to check that "only specific HRC fuses have been used" in the rectifier cum regulator box?

38 / 50

38. What is the purpose of the "tension rod fixing pin of alternator with washer and split pin" check during trip schedule?

39 / 50

39. In the dehydrator check, what does it indicate if "the outlet is colder than the inlet" after 15 minutes of operation?

40 / 50

40. During the compressor operational check, what specific gauge readings are examined for abnormality, and what do they represent?

41 / 50

41. What does checking the "direction of rotation for correctness" of the compressor motor and condenser motor ensure from a refrigeration cycle perspective?

42 / 50

42. In compressor motor maintenance, what is the specific instruction regarding the "dark tan film" on the commutator, and why is this significant?

43 / 50

43. For VRLA batteries stored as spares, what specific environmental conditions must be avoided, and what is the ideal storage temperature range?

44 / 50

44. During battery maintenance, what is the rationale for checking "heating signs on the positive and negative terminals"?

45 / 50

45. In the alternator inspection, what is the purpose of checking the "flexible pipe carrying the cables" and ensuring it is "connected properly to the grommet"?

46 / 50

46. What is the significance of checking the "profile of 'V' groove" in both trip schedule and monthly schedule for pulleys?

47 / 50

47. Why is there a difference in the number of belts required for primary depot (12) versus secondary depot (10) for each alternator?

48 / 50

48. During trip schedule inspection of the axle pulley, what specific tool is mentioned to check the distance between wheel axle and axle pulley?

49 / 50

49. In Self Generating coaches with Roof Mounted Package Units, what is the role of the 25 KVA inverters and where are they located?

50 / 50

50. What is the fundamental difference between the two types of End-On-Generation (EOG) coaches mentioned in the document?

Your score is

The average score is 0%

error: Content is protected !!
Scroll to Top