Course Content
Diesel Traction & Trainsets
Disaster Management, Safety
EnHM, Planning & PCO
G K
Numerical Aptitude
Carriage & Wagon Theory for LDCE(Mech)

difficult wagon body

1 / 50

1. What is the complete requirement for lettering during POH?

2 / 50

2. What are the complete anti-corrosive measures listed in the document?

3 / 50

3. What is the complete requirement for welding regarding craters?

4 / 50

4. What are the complete codes for well wagons from 80 to 84?

5 / 50

5. What is the complete rule for individual wagon number allocation across different wagon types?

6 / 50

6. In the check digit calculation, what are the complete formulas?

7 / 50

7. What is the complete reporting requirement for lock bolt failures?

8 / 50

8. What are the complete procurement requirements for lock bolts?

9 / 50

9. What is the complete prohibition regarding hole matching for lock bolts?

10 / 50

10. What are the complete checks for proper lock bolt installation?

11 / 50

11. What are the complete installation steps for lock bolts?

12 / 50

12. What is the complete specification for CRF section used in BOXNR rehabilitation?

13 / 50

13. What are the complete features of BOXNR end wall construction?

14 / 50

14. What are the complete features of BOXNR sidewall construction?

15 / 50

15. What is the complete requirement for empty tank wagons before welding?

16 / 50

16. What are the complete items that should not be done according to the Don'ts list?

17 / 50

17. What is the complete requirement for door hooks regarding their placement and function?

18 / 50

18. What are the complete precautions to be taken while fitting patches to structural members regarding rivets?

19 / 50

19. What is the complete code list for wagons owned by private parties?

20 / 50

20. What is the complete range for traffic stock individual numbers and the reset rule?

21 / 50

21. What is the complete range for departmental stock individual numbers and the reset rule?

22 / 50

22. What are the complete numerical codes for South Central Railway?

23 / 50

23. In the check digit calculation, if S4 = 43, what is the check digit?

24 / 50

24. What is the complete check digit calculation algorithm?

25 / 50

25. What are the complete codes for brake vans from 85 to 89?

26 / 50

26. What are the complete codes for open wagons from 10 to 29?

27 / 50

27. What is the complete structure of the 11-digit wagon number?

28 / 50

28. What are the complete recommendations for Zonal Railways regarding lock bolts?

29 / 50

29. What is the complete procedure for proper lock bolt installation?

30 / 50

30. What are the complete constructional differences between BOXN and BOXNR end walls?

31 / 50

31. What are the complete constructional differences between BOXN and BOXNR sidewalls?

32 / 50

32. What are the complete precautions for welding wagons with CTRBs?

33 / 50

33. What are the complete precautions for welding loaded wagons?

34 / 50

34. What is the complete surface preparation and painting sequence for inaccessible surfaces?

35 / 50

35. What are the complete advantages of the retrofittable sliding door?

36 / 50

36. What are the complete components of the retrofittable sliding door design features?

37 / 50

37. What are the complete modifications made to the roller system in the single-piece pressed sliding door?

38 / 50

38. What was the complete purpose of Design Modification-I for BCNHL doors?

39 / 50

39. What are the complete requirements for door repairs regarding hinges and operation?

40 / 50

40. What is the complete marking requirement after making a wagon watertight?

41 / 50

41. What are the complete dimensions for openings requiring patching or welding for water tightness?

42 / 50

42. What is the complete water tightness testing requirement for covered wagons?

43 / 50

43. What are the complete requirements for repairing a cracked stanchion?

44 / 50

44. What is the complete procedure for repairing bulged ends using the hydraulic jack method?

45 / 50

45. In the welded patch procedure, what is the complete sequence for floor plate modification when fitting patches?

46 / 50

46. What is the complete surface preparation and painting requirement for panel patches before storage?

47 / 50

47. What is the complete list of corrosion causes related to consignments?

48 / 50

48. In flat/well wagons, how are flexible side stanchions attached and what additional features exist for container wagons?

49 / 50

49. What is the complete construction of ends in covered wagons including ventilation features?

50 / 50

50. In open wagons, what specific locking arrangement is provided at the top of doors to prevent slipping during tippling?

Your score is

The average score is 0%

error: Content is protected !!
Scroll to Top