medium lhb painting

This includes many steps from surface preparation to final top coat.

1 / 40

1. What is the complete sequence of operations in Paint Schedule of LHB Coaches as per Annexure 8C?

Different areas include exterior, interior, side walls, end walls, underframe, roof, etc.

2 / 40

2. What are the application areas for each operation as per Annexure 8C?

This involves cleaning and touching up damaged areas only.

3 / 40

3. What is the first step in Paint Schedule 'C' as per Annexure 8B?

This involves removing old paint and leveling imperfections.

4 / 40

4. What is the first step in Paint Schedule 'A' as per Annexure 8A?

This is specifically for cleaning a particular type of sheet.

5 / 40

5. What is the purpose of cleaning brushes with soda ash?

Four specific types are named, including "Shave tukes".

6 / 40

6. What types of scrapers are mentioned for painting work?

These are numbered sizes with slash notation.

7 / 40

7. What are the round brush sizes mentioned?

These are standard metric sizes in mm.

8 / 40

8. What are the sizes of flat brushes mentioned for painting?

This is an RDSO CMI number from 2013.

9 / 40

9. What is the RDSO CMI number for tools and plants for painting?

This is rounded up to one decimal place.

10 / 40

10. What is the requirement for carrying capacity marking on OCV's?

This code is from IRCA Conference Rules.

11 / 40

11. What transportation code should be applied on coaches?

This shows when the coach needs to go for POH.

12 / 40

12. What information should be stenciled on the left side of end panel regarding return date?

This is a 5-digit sketch number starting with 77.

13 / 40

13. What sketch number specifies yellow stripes on anti-telescopic coach end walls?

This involves sanding, filling, and repainting.

14 / 40

14. What is the treatment for wooden batten seats?

These seats do not require painting at all.

15 / 40

15. What is the treatment for laminated plastic seats?

This is an M&C/PCN specification with year 2013.

16 / 40

16. What RDSO specification is used for painting FRP windows with polyurethane paints?

Complete removal and full repainting is required.

17 / 40

17. What is the correct treatment for deteriorated paint on aluminum mouldings?

This is an MDTS number with specific RCF reference.

18 / 40

18. What is the technical specification number for interior painting of LHB shells?

This document number is PLW0961.

19 / 40

19. What is the RCF document number for interior painting of shells?

Consider the full process after primer dries.

20 / 40

20. What is the sequence of operations in Paint Schedule 'C' after primer application?

This is a manual method applied only where needed.

21 / 40

21. What is the application method for primer in Paint Schedule 'C'?

This is a specific micron value for touch-up work.

22 / 40

22. What is the DFT requirement for epoxy zinc phosphate primer in Paint Schedule 'C'?

This is a specific RAL number for cobalt blue.

23 / 40

23. What is the RAL number for cobalt blue used in lettering?

This IS number is for colour standards.

24 / 40

24. What is the IS specification for golden yellow colour No. 356?

Two specific measurements are required.

25 / 40

25. What checks should be performed after applying second coat of Polyurethane Enamel?

This document number is PLW0960.

26 / 40

26. What is the RCF document number that covers full gloss Polyurethane Enamel application?

Consider drying time and sanding method with specific grade paper.

27 / 40

27. What is the correct sequence after applying Polyurethane surfacer?

This document number is PLW0958.

28 / 40

28. What is the RCF document number that covers Polyurethane surfacer application?

This step removes what accumulates during sanding.

29 / 40

29. What is the purpose of using jet water after dry flattening?

This is a pneumatic tool with specific grade paper.

30 / 40

30. What equipment is used for dry flattening of putty?

Both coats have the same thickness requirement.

31 / 40

31. What is the exact DFT requirement for the first and second coat of putty?

This document number also starts with PLW095.

32 / 40

32. What is the RCF document number that covers putty application procedures?

This document number starts with PLW095.

33 / 40

33. What is the RCF document number that covers primer application procedures?

One option is eco-friendly, the other involves abrasive blasting.

34 / 40

34. What are the two options for primer application in Schedule 'A'?

This is the time needed for proper curing before sanding.

35 / 40

35. What is the air dry time required for light weight body filler before dry flattening?

This is an MDTS specification number.

36 / 40

36. What is the specification number for light weight body filler used on welded joints?

This IS number is specifically for petroleum hydrocarbon solvent.

37 / 40

37. What is the IS specification for petroleum hydrocarbon solvent used to remove paint remover traces?

Consider the condition of existing paint and whether bare metal is exposed.

38 / 40

38. What is the decision criteria for choosing between Paint Schedule 'A' and Paint Schedule 'C'?

Think about durability, appearance, environmental resistance, and maintenance frequency.

39 / 40

39. What are the six disadvantages of Alkyd painting system mentioned?

Consider the progression from oldest to newest based on coach types (ICF to LHB).

40 / 40

40. What are the four painting systems used in Indian Railways in chronological order of development?