1. What specific information must be recorded on Brake Power Certificate regarding air pressure?

This includes inspection dates and defect information

2 / 40

2. What specific fields are included in the Warranty Card (Annexure 2.4) besides coach details?

This is 5 days less than AC coach POH

3 / 40

3. What is the total number of direct activity days for POH of Non-AC LHB coaches?

This is 3 days

4 / 40

4. How many days are allocated for corrosion attention in Non-AC LHB coach POH?

This is 4 days

5 / 40

5. How many days are allocated for lifting, bogie washing, repair, and lowering in AC coach POH?

This is 21 days

6 / 40

6. What is the total number of direct activity days for POH of AC LHB coaches?

This relates to write-off of materials

7 / 40

7. What specific document should be submitted to Budget section for Appropriation Accounts?

This is the RPF officer at the base station

8 / 40

8. Who investigates additional deficiencies noticed at workshop?

This is an even number

9 / 40

9. How many copies of additional deficiency list are prepared at workshop when extra deficiencies are noticed?

They are both locked AND sealed

10 / 40

10. What happens to upper class coaches after joint check at starting station?

It is placed inside the compartment

11 / 40

11. What is done with one copy of the deficiency list at the originating station?

This is an odd number between 3 and 7

12 / 40

12. How many copies of deficiency list are prepared during joint check before sending coach to workshop?

This is from February 2010

13 / 40

13. What specific RDSO specification governs LED-based destination boards?

This is a March 2009 report

14 / 40

14. What specific CAMTECH report number provides facilities requirements for en-route coach watering?

This test uses colored dye to detect surface cracks

15 / 40

15. What specific test must be performed after dressing the final weld contour?

This is 70 Volts minimum

16 / 40

16. What is the minimum OCV requirement for AC welding machine used in coach repairs?

This is larger than the root run electrode

17 / 40

17. What specific electrode diameter is recommended for subsequent runs after root run?

This is 15-20 mm from the crack ends

18 / 40

18. What is the exact distance from crack extremities where stop holes should be drilled?

This is from October 2007

19 / 40

19. What specific RDSO letter authorizes the repair procedure for cracks on sole bar near yaw damper bracket?

This is document PLW 905 from June 2004

20 / 40

20. What specific RCF document governs P.U. surfacer/touch up application on shell?

These are Part No: 7&16 with 8mm thickness

21 / 40

21. What specific part numbers are identified as Lower Flange requiring attention?

This is Part No: 22 with specific thickness

22 / 40

22. What specific part numbers are identified as Web components requiring corrosion inspection?

Workshops have a different tolerance than production units

23 / 40

23. What is the exact minimum height from rail level for CBC under tare condition for workshops?

This is found in Chapter 5 of the manual

24 / 40

24. What specific document reference provides the procedure for coupler height adjustment?

This is a security component that protects the centre pivot

25 / 40

25. What specific part must be removed before lifting regarding centre pivot?

This is shown in Figure 2.4 of the manual

26 / 40

26. What specific design of trestle is recommended for supporting coach body after lifting?

This is 18 months plus a specific number of days OR 6 Lakh km

27 / 40

27. What is the exact tolerance for SS-I (Shop Schedule I) in terms of months and kilometers?

This is a small tolerance of just a few days

28 / 40

28. What is the exact tolerance for D2 (Monthly) Schedule periodicity?

This is a 2022 letter from Railway Board

29 / 40

29. What specific Railway Board letter governs warranty on quality of POH during POH of rolling stock?

This is half a meter on each side

30 / 40

30. What is the exact width of side wall cut required on either side of lifting pads when corrosion is suspected?

This involves cutting the trough floor to a specific width

31 / 40

31. What is the exact procedure for examining sole bar and body pillar at lavatory area when corrosion is suspected in bottom half?

This is version 2.0 issued in May 2021

32 / 40

32. What specific RDSO CMI number provides detailed guidelines for corrosion repairs in LHB coaches?

This drawing number starts with LP1110

33 / 40

33. What specific drawing number is referenced for longitudinal member top flanges prone to corrosion in LWLRRM luggage compartment?

Power cars have thicker sole bars due to higher loads

34 / 40

34. What is the exact section size of sole bar for AC Power cars?

These are top flange components under lavatory modules

35 / 40

35. What specific part numbers and thicknesses are identified as vulnerable to corrosion under lavatory modules?

This is thinner than the insulation near bogie areas

36 / 40

36. What is the exact thickness of sound insulation applied on floor residual regions?

This is a combination of elements in flooring and bogie

37 / 40

37. What specific decoupling elements are used in flooring to prevent structure-borne noise transmission?

This insulation material is available in a range starting from 20 mm

38 / 40

38. What is the exact thickness range of Resonaflex Alu insulation available in 5 mm steps?

This specification includes a corrigendum from October 2015

39 / 40

39. What specific RDSO specification and amendment governs the chemical composition of Ferritic steel used in side walls?

Nickel is one of the key alloying elements that contributes to corrosion resistance

40 / 40

40. What is the specific chemical composition range of Nickel in IRS M-41 Corten Steel used for underframe construction?