Course Content
Diesel Traction & Trainsets
Disaster Management, Safety
EnHM, Planning & PCO
G K
Numerical Aptitude
Carriage & Wagon Theory for LDCE(Mech)

difficult wagon yard main

1 / 50

1. What is the specific requirement for the Base Depot regarding maintenance of complete history of wagons and components for CC rakes?

2 / 50

2. In the context of the APM Device, what is the action recommended for proper fitment of flexible hoses?

3 / 50

3. What is the complete procedure for dealing with heavy leakage that cannot be arrested in a wagon?

4 / 50

4. For a CC rake, what is the responsibility of the Loco Pilot and Train Manager regarding examination at unloading point?

5 / 50

5. What is the specific instruction regarding the commissioning of new BLC/BLL rakes?

6 / 50

6. In the context of brake cylinder problems, what is the preventive action for ensuring correct bolt size usage?

7 / 50

7. What is the complete requirement for the revalidation of BPC for empty container rakes?

8 / 50

8. For a BLCA/BLCB rake, what is the significance of "01 unit = 05 wagons" in the context of rake integrity?

9 / 50

9. What is the specific condition regarding the movement of empty rake/back loaded rake from unloading point to first examination point?

10 / 50

10. What is the complete procedure for checking brake cylinder piston stroke during service application test?

11 / 50

11. In the context of the APM Device, what action is recommended if incorrect bolt size has been used causing damage to the bracket?

12 / 50

12. What is the specific requirement for BPC issued after thorough freight examination in empty condition for CC rakes?

13 / 50

13. What is the complete instruction for securing a rake whenever it is stabled?

14 / 50

14. In the context of brake beam issues, what is the consequence of missing split pins above the Brake head pin?

15 / 50

15. What is the specific requirement for the examination of locks of all container wagons?

16 / 50

16. For a CC rake, what is the condition regarding breaking the rake into parts and reforming?

17 / 50

17. What is the specific action to be taken when a defective brake cylinder is identified and isolated?

18 / 50

18. What is the complete set of items that must be checked during the visual examination before rake testing in a twin pipe system?

19 / 50

19. What is the specific instruction regarding the attachment/detachment of wagons or reversal of power at a non-TXR point?

20 / 50

20. According to the document, what is the correct method to check for continuity of brake pipe after coupling?

21 / 50

21. What is the specific requirement for the formation of close circuit air brake rakes as far as possible?

22 / 50

22. What is the complete procedure for dealing with a loaded premium rake after the grace period expires?

23 / 50

23. In the context of brake cylinder problems, what is the preventive action for preventing dust and dirt entry?

24 / 50

24. What is the specific requirement for CC rakes regarding the monitoring through FOIS?

25 / 50

25. For a rake having both conventional and BMBS wagons, what is the basis for calculative Brake Power percentage?

26 / 50

26. What is the specific preventive action recommended for proper fitment of APM Device bracket on the under-frame?

27 / 50

27. According to the document, what is the correct procedure for checking continuity and leakage in a twin pipe system rake?

28 / 50

28. What is the complete validity condition for a Tower wagon's safety certification?

29 / 50

29. What is the specific instruction regarding the use of Teflon tape for arresting leakages?

30 / 50

30. In the context of the APM Device, what is the preventive action to avoid flexible hoses getting cut or damaged?

31 / 50

31. What is the specific role of the supervisor in charge regarding departmental rolling stock before starting operation?

32 / 50

32. What is the prescribed action for a CC rake with invalid BPC detected during run or subsequent examination?

33 / 50

33. For a CC rake, what is the specific condition regarding intermediate examination?

34 / 50

34. What is the specific requirement for the Train Manager's emergency brake valve during testing?

35 / 50

35. According to the document, what is the correct action when a hissing sound indicates heavy leakage in a particular area?

36 / 50

36. What is the specific requirement for the examination of departmental wagons in material trains/ballast trains/PQRS trains?

37 / 50

37. In the context of the APM Device, what is the preventive action recommended to ensure proper functioning?

38 / 50

38. What is the complete procedure for checking brake cylinder operative percentage?

39 / 50

39. For a BLCA/BLCB rake, what is the maximum number of wagons that can be detached/replaced during the run without affecting BPC validity?

40 / 50

40. What is the specific warning about using the wrong type of isolating cock in the brake cylinder line?

41 / 50

41. According to the common problems table, what is the specific en-route action for a brake cylinder not releasing even after isolating the DV?

42 / 50

42. What is the prescribed procedure for dealing with a CC rake whose Kms/Days limit is breached while in empty condition?

43 / 50

43. In the automatic test rig requirements, what is the minimum battery backup requirement?

44 / 50

44. What is the specific requirement for CC rakes regarding the line of OHE passing over the maintenance lines?

45 / 50

45. What is the complete set of conditions for a Premium end-to-end rake to be certified as such?

46 / 50

46. In the context of Brake Power calculation, how should BVZI and BVCM brake vans be treated for uniformity according to the guidelines?

47 / 50

47. What is the specific instruction regarding closing brake pipe angle cocks for isolating wagons with distributor valve leakage?

48 / 50

48. What constitutes a breach of rake integrity for a Close Circuit rake regarding the predefined circuit?

49 / 50

49. For a Premium rake, what specific condition must be met regarding the examination points for it to retain its "Premium" status?

50 / 50

50. In a scenario where back loading is done at a non-TXR station and a flying squad is not operationally feasible, what is the permitted course of action?

Your score is

The average score is 0%

error: Content is protected !!